SOLUTION: A library crew can shelve books in six hours. Another crew can do the job in four hours. If the first crew begins and is joined by the second crew one hour later, how many hours wi
Algebra.Com
Question 819762: A library crew can shelve books in six hours. Another crew can do the job in four hours. If the first crew begins and is joined by the second crew one hour later, how many hours will it take for the job to be completed?
Answer by josmiceli(19441) (Show Source): You can put this solution on YOUR website!
Library crew's rate of working:
Fraction of the job done in 1 hour by library crew:
------------------
is the fraction left to be
finished by both crews
Let = time in hours to finish the job
Multiply both sides by
hrs
The job takes hrs to complete
RELATED QUESTIONS
A library crew can shelve books in eight hours. another crew can do the job in six hours. (answered by lwsshak3)
A library crew can shelf books in six hours. Another crew can do the job in four hours.... (answered by lwsshak3)
A 3-men crew can do a certain job in 3 weeks and 2 days, if we are to hire 4 men crew... (answered by josmiceli)
One roofing crew can finish a 2,800-square-foot roof in 12 hours, and another crew can do (answered by josgarithmetic)
One crew can detassel a field of corn in 6 days. Another crew can do the same job in 4... (answered by ankor@dixie-net.com)
A painting crew can paint 4 room in 7 hours. If the crew works at the rate, how many... (answered by josmiceli)
A roofing crew can roof a house in 10 hours. If a second crew was added, the job would... (answered by CharlesG2)
A 3-men crew can do a certain job in 4 hours, while it takes a 4-men crew to do the same... (answered by ankor@dixie-net.com)
in checking records finds that crew A can pave a contract length of highway in 8 hours.... (answered by scott8148)