SOLUTION: It takes Albert and Billy 8 hours to shovel snow off a driveway together. Albert shovels snow slower than Billy. Billy would only take 12 hours to shovel the snow on his own. How m

Algebra.Com
Question 817289: It takes Albert and Billy 8 hours to shovel snow off a driveway together. Albert shovels snow slower than Billy. Billy would only take 12 hours to shovel the snow on his own. How many hours would it take Albert to shovel the snow on his own?
Answer by jsmallt9(3758)   (Show Source): You can put this solution on YOUR website!
The key to these rate of work problems is to focus not on how long it takes someone to complete the whole job (which is what you are usually given) but on how much of the job that person/group can do in a single hour.
Let a = the number of hours Albert would take shoveling on his own. Then
1/a = the fraction of the job which Albert can complete in 1 hour.
12 = the number of hours Billy would take shoveling on his own. Then
1/12 = the fraction of the job which Billy can complete in 1 hour.
8 = the number of hours the time is takes for both together to finish. Then
1/8 = the fraction of the job they can complete together in 1 hour.

We can solve this with an equation that says that the sum of the individual rates is the rate of the two of them together:

Now we just solve this equation. It is probably easiest if we eliminate the fractions. This can be done all at once if we multiply each side of the equation be the lowest common denominator (LCD) of all the denominators. The LCD of a, 12 and 8 is 24a. So we multiply each side by 24a:

As we multiply (using the Distributive Property on the left, of course) all the denominators will cancel out:

Subtract 2a:

So Albert would take 24 hours to finish if he worked by himself.

RELATED QUESTIONS

It takes Eddie 2 hours to shovel the snow from a driveway and sidewalk. Brad can shovel... (answered by Boreal,josgarithmetic,solver91311,ikleyn)
Allen can do a job 5 times faster than Billy. Billy can do the same job in 8 hours. How... (answered by josgarithmetic)
Allen can do a job 5 times faster than Billy. Billy can do the same job in 8 hours. How... (answered by josgarithmetic,greenestamps,Edwin McCravy,math_tutor2020)
Chuck can shovel the snow off his driveway in 40 minutes. He shovels for 20 minutes and... (answered by askmemath)
Chuck can shovel the snow off his driveway in 40 minutes. He shovels for 20 minutes and... (answered by bucky)
it takes you about 37 minutes to shovel snow from a driveway. Estimate how many driveways (answered by Alan3354)
1. It takes Mom, Dad and Isabel two hours to shovel their driveway after a snow storm. If (answered by ikleyn)
It takes Billy 2 hours to do a certain job than it takes Reena. They worked together for... (answered by lwsshak3)
ben can paint a face in 3 hours and billy takes 4. How many hours will it take them to... (answered by nerdybill)