Question 811036: John can finish a job in 5 hours. Steve can finish the same job in 4 hours. After working together for 1 hour, steve leaves. How long will it take John to complete the job?
Found 2 solutions by richwmiller, Bastian21:
Answer by richwmiller(17219)   (Show Source): You can put this solution on YOUR website!
1/5+1/4=4/20+5/20=9/20
20/20-9/20=11/20
x/5=11/20
55/20=x
11/4=2.75 hours

Answer by Bastian21(2)   (Show Source): You can put this solution on YOUR website!
John time is 5 hours = 1/5
Steve time is 4 hours = 1/4
LCM is 20. (5 x 4 = 20)
Therefore, 4/20 + 5/20= 9/20
20/20 - 9/20 = 11/20
x/5= 11/20
Cross Multiplying
20x=55
Therefore x = 55/20
Time John took to complete the job is = 2.75 hrs


RELATED QUESTIONS

John can finish a job in 5 hours. Steve can finish the same job in 4 hours. After working (answered by richwmiller)
21. If carol can finish a job in 5 hours and Steve can finish the same job in 10 hours,... (answered by josmiceli)
If carol can finish a job in 5 hours and Steve can finish the same job in 10 hours, how... (answered by richwmiller)
John can finish painting a house in 8 hours. Julie can finish the same job in 10 hours. (answered by richwmiller)
John can finish a job two hours longer than Cris. after working for one hour,Cris joins... (answered by josgarithmetic)
Randy can finish a certain job in 8 hours. Jerry can finish the same job in 10 hours, and (answered by richwmiller)
The first painter can finish a paint job in 3 hours. The second painter can finish the... (answered by edjones)
A carpenter can complete a job in 5 hours. After working on the job for 2 hours, an... (answered by ankor@dixie-net.com)
Joe can do a job in 6 hours and charlie can do the same job in 5 hours. What part of the... (answered by macston)