SOLUTION: a person can do a piece of work in 12 days. after working alone or 4 days.he hires a helper and both them together complete the task for 6 days.how long would it have taken for the
Algebra.Com
Question 764332: a person can do a piece of work in 12 days. after working alone or 4 days.he hires a helper and both them together complete the task for 6 days.how long would it have taken for the helper to alone to complete a given task?
Answer by solver91311(24713) (Show Source): You can put this solution on YOUR website!
Why did you ask the same question twice?
John

Egw to Beta kai to Sigma
My calculator said it, I believe it, that settles it
RELATED QUESTIONS
a person can do a piece of work in 12 days. after working alone or 4 days.he hires a... (answered by solver91311,josgarithmetic)
1.'A' works twice as fast as 'B'. If both of them together take 6 days to complete the... (answered by josmiceli,vvnrichards)
A and B working together can finish a piece of work in 20 days. After working together... (answered by htmentor)
Mr Asif can do a job in 10 days. After working 3 days, he hires a helper and the two... (answered by ankor@dixie-net.com)
A and B together can do a piece of work in 12 days, which B and C together can do in 16... (answered by KMST)
Brandon and Chris together can do a piece of work in 12 days. After Brandon has worked... (answered by ankor@dixie-net.com)
Eric and Nathan together can do a piece of work in 3 days. If it takes Eric working alone (answered by josgarithmetic)
A does 3/10 of a work in 6 days .He then calls in B and they finish the work in 7 days... (answered by ankor@dixie-net.com)
A can do as much work in 5 days as B can do in 6 days.If both of them work together can... (answered by josmiceli)