SOLUTION: It takes two hours for 4 boys to shovel a driveway. How many minutes does it take 5 boys to shovel the driveway?

Algebra.Com
Question 759953: It takes two hours for 4 boys to shovel a driveway. How many minutes does it take 5 boys to shovel the driveway?
Answer by josgarithmetic(39620)   (Show Source): You can put this solution on YOUR website!
What is the work rate for 1 boy?

4 boys do the job in 2 hours;
1 boy does the job in 2*4 hours, or 8 hours.

* Rates of simultanous working boys are additive.
* Each boy works at the rate of 1/8 jobs per hour.
* Basic relationship is , using R for rate, t for time, j for how many jobs.

Five boys work together.

Find t hours.

RELATED QUESTIONS

If 4 boys can shovel a driveway in 2 hours, how many minutes will 5 boys take to do the... (answered by nyc_function)
It takes 45 min for 2 people to shovel a driveway. How long would it take 5 people to... (answered by stanbon)
it takes you about 37 minutes to shovel snow from a driveway. Estimate how many driveways (answered by Alan3354)
1. It takes Mom, Dad and Isabel two hours to shovel their driveway after a snow storm. If (answered by ikleyn)
Joan can shovel a certain driveway in 50 minutes. If Mary can shovel the same driveway... (answered by ewatrrr)
Joan can shovel a certain driveway in 50 minutes. If mary can shovel the same driveway... (answered by nerdybill)
It takes Eddie 2 hours to shovel the snow from a driveway and sidewalk. Brad can shovel... (answered by Boreal,josgarithmetic,solver91311,ikleyn)
Ronald can shovel the driveway in 6 hours, but if his brother Donald helps it would take... (answered by josgarithmetic)
Marvin can shovel the driveway of his family home in 30 minutes. It takes his wife, Nina, (answered by rapaljer)