If four men working at the same rate can do 2/3 of a job in 40 minutes,
then the number of minutes (m)to complete the job is:
m = 40
2m = 3 * 40
2m = 120
m = 60 min for four men to do the job
therefore
4 * 60 = 240 man-minutes to do the job
:
how many minutes would it take one man working at this rate to do 2/5 of the job?
1m = *240
1m = 96 minutes for 1 man to do 2/5 of the job

RELATED QUESTIONS

if five men can do a piece of job in twenty-five days, how many days will it take ten men (answered by ewatrrr)
14 men took 6 hours and 40 minutes to complete a job. if two of 8 men leave after... (answered by ankor@dixie-net.com)
If 20 men can complete a piece of job in 8days, how long will it take 10 men to finish... (answered by Theo)
if four men do a piece of work in 8 days how many days will it take 16 men working at the (answered by ewatrrr)
One computer takes 21 minutes longer than a second computer to do the job. Working... (answered by josmiceli)
If Robert can seal 40 envelopes in one minute, and Paul can do the same job in 80... (answered by RoRo Jaxson)
if 9 men can do a piece of work for 20 days, how long would it take 4 men to do do,... (answered by josgarithmetic)
sam can complete a job in 20 minutes working alone. if he joined by the twins jim and tim (answered by ankor@dixie-net.com)
If 6 men do a job in 12 days, how long would 18 men take, working at the same rate? HEY... (answered by Alan3354)