Question 737434: If John can shingle a roof alone in 7 hours and Stuart can shingle a roof alone in 3 hours, how long will it take to shingle the roof if John and Stuart work together? Round your answer to the nearest hundredth.

Answer by richwmiller(17219)   (Show Source): You can put this solution on YOUR website!
1/3+1/7=1/x
x=21/10

RELATED QUESTIONS

It takes Jay three times as long to shingle a roof than it does Aaron. When they work... (answered by josgarithmetic,MathTherapy)
A roofer requires 15 hours to shingle a roof. And apprentics roofer can do tthe job in 21 (answered by stanbon,Theo)
Tom and Jack are shingling a roof. Tom takes 75% of the time Jack does to shingle a... (answered by ankor@dixie-net.com)
20 hens housed in 3 pens will hatch 30 eggs in 80 days. How long will it take 30 hens in... (answered by ankor@dixie-net.com)
an experienced roofer can work twice as fast as helper. working together, they can... (answered by Boreal)
solve. Round to the nearest tenth of necessary Mr. Jansen can shingle a roof in... (answered by josmiceli)
Construction A roofer requires 12 hours to shingle a roof. After the roofer and an... (answered by scott8148)
A roofer requires 14 h to shingle a roof. After the roofer and an apprentice work on a... (answered by TimothyLamb)
A roofer requires 16 h to shingle a roof. After the roofer and an apprentice work on a... (answered by richwmiller)