Question 731045: Please help me solve this equation: It takes 4 men 16 hours to pave a footpath. How long would it take 3 men to pave the same area?
Answer by richwmiller(17219)   (Show Source): You can put this solution on YOUR website!
There is no equation to solve.
It is a rate of work word problem.
4*16=64 man hours are needed
It is assumed in this type problem that everyone works at the same rate.
64/3=21 1/3 hours for 3 men

RELATED QUESTIONS

It takes 3 men 5 days to pave one mile of road. How long would it take 2 men to pave 10... (answered by ewatrrr)
If it takes 3 men 2 hours to build a wall, how long would it take 4 men? (answered by Cromlix)
If a surfacing crew takes 167 seconds to pave 29 feet of asphalt, how many hours will it... (answered by solver91311)
if it takes 8 1/2 hours for 6 workers to pave 140 meters of road how many hours would it... (answered by ptaylor)
It takes nine days for 8 worker to pave a stretch of road. If each worker works at the... (answered by Mathtut)
a mason's helper requires 4 hours more to pave a concrete walk than it takes the mason.... (answered by edjones)
If it takes 4 workers 6 hours each to pave a road, how many hours will it take 12... (answered by amoresroy)
Please help! I need to know the basic forumla to work out problems such as this: If... (answered by scott8148)
It takes 3 men 6 hours to paint a house. How long would it take 2 men to paint the house? (answered by ewatrrr,josmiceli)