SOLUTION: one man & 2 boys can do a piece of workin 12 days, which can also done by 3 men & 1 boy in 6 days. How long it would take for one alone man to complete the work?

Algebra.Com
Question 72642: one man & 2 boys can do a piece of workin 12 days, which can also done by 3 men & 1 boy in 6 days. How long it would take for one alone man to complete the work?
Answer by stanbon(75887)   (Show Source): You can put this solution on YOUR website!
one man & 2 boys can do a piece of workin 12 days, which can also done by 3 men & 1 boy in 6 days. How long it would take for one alone man to complete the work?
--------
I would appreciate seeing how your text or instructor does these problems.
--------
This is the best I can do with it:
(1m + 2b)(12 days) = 1 job
(3m + 1b)(6 days) = 1 job
-----------------
The 1st equation can be changed to read:
2(1m+2b)(12 days)(1/2) = 1 job
or
(2m+4b)(6 days) = 1 job
-------------
Then you can see that 3m+1b = 2m+4b
Then 1m=3b
or b=(1/3)m
-------------
Putting that into the 1st equation you can get:
(1m + 2(1/3)m)(12 days) = 1 job
[(5/3)m](12 days) = 1 job
Then: (3/5)[(5/3)m](12 days)(5/3)= 1 job
(1 m)(20 days) = 1 job
--------
So, 1 man can do the job in 20 days.
========
Cheers,
Stan H.

RELATED QUESTIONS

One man and 2 boys can do a piece of work in 12 days, which can also be done by 3 men and (answered by 303795)
A man and a boy can do in 15 days of work in which would be done by 7 men and 9 boys in 2 (answered by ankor@dixie-net.com)
1) 2 men and 7 boys can do a piece of work in 4 days. The same work is done by 4 men and... (answered by Edwin McCravy)
2 men and 5 boys can do a piece of work in 4 days, while 4 men and 4 boys can do it in 3... (answered by josgarithmetic,MathTherapy,ikleyn)
2 men and 5 boys can do a piece of work in 4 days, while 4 men and 4 boys can do it in 3... (answered by josgarithmetic,ikleyn,MathTherapy)
4 men and 4 boys can do a piece of work in 3 days while 2 men and 5 boys can finish it... (answered by ankor@dixie-net.com)
2 men and 5 boys can do piece of work in 4 days , while 4 men and 4 boys can do in 3 day. (answered by Edwin McCravy,oberobic)
Q1. if 2 men or 3 women or 6boys can do a piece o work in 70 days,in what time would 2... (answered by ankor@dixie-net.com,vvnrichards)