SOLUTION: If it takes two men three hours to dig a hole 4 meter long, four meters wide, and four meters deep, how long would it take the same two men to dig a hole 12 meters long, 12 meters

Algebra.Com
Question 720095: If it takes two men three hours to dig a hole 4 meter long, four meters wide, and four meters deep, how long would it take the same two men to dig a hole 12 meters long, 12 meters wide and 12 meters deep?
Answer by god2012(113)   (Show Source): You can put this solution on YOUR website!
total number of people = 2
Total duration = 3 hrs
Total volume of the hole = 4 * 4 * 4 = 64 cubic m
Required hole volume = 12 * 12 *12
Total time taken by 2 people = (12*12*12 / 64 ) * 3 = 81 hrs

RELATED QUESTIONS

how long would it take four machines to dig a hole 40 meters long, 20 meters wide, and 10 (answered by mananth)
It takes a man one hour to dig a hole 2 meters long, 2 meters wide, and 2 meters deep.... (answered by ptaylor)
If it takes 8 men 9 hours to dig a hole in 20 meters deep,how long would it take 10 men... (answered by ankor@dixie-net.com)
If it takes two men two hours to dig a hole 3 metres long, 3 metres wide and 3 metres... (answered by josgarithmetic)
If it takes 2 men 2 hours to dig a hole 3 foot long, 3 foot wide, 3 foot deep. How long,... (answered by solver91311)
if it takes 4 men 12 days to dig a hole, how long would it take 6... (answered by ptaylor)
is it takes a man 1 hour to do a whole 3 meters long 3 meters wide and 3 meters deep how... (answered by josmiceli)
If it takes 6 men 4 days to dig a hole 3 metres deep, how long will it take for 10 men to (answered by josgarithmetic,ikleyn)
Answer this school maths question - If it takes three men three hours to dig a hole, how... (answered by ankor@dixie-net.com)