SOLUTION: Work Rate: After working together on a common job, one worker completes x+2/4 of the work and another completes x+3/6 of the work. How much more did the first worker accomplish tha

Algebra.Com
Question 687626: Work Rate: After working together on a common job, one worker completes x+2/4 of the work and another completes x+3/6 of the work. How much more did the first worker accomplish than the second?
My answer and steps:
x+2/4 - x+3/6 = 6x+12/4 - (-4x-12)/24 = 10x/24 which is lowest term to 5x/12

Answer by josmiceli(19441)   (Show Source): You can put this solution on YOUR website!
I assume that the job was completed
after they did their work.
So, each one contributed a fraction and
the 2 fractions should add up to 1.

Multiply both sides by






and


---------------------
I get they both did 1/2 of the job.
Check my work, though

RELATED QUESTIONS

A roofer and an apprentice are roofing a newly constructed house. In one day, the roofer... (answered by Boreal)
A,B,C can finish a piece of work in 60 days. They work together for 10 days after which A (answered by htmentor)
John can do a piece of work in 6 hours. With the help of mary he completes the job in 4... (answered by ewatrrr)
1.) Sketch the graph of{(x,y)absolute value x-y=3 and x+2y>4} 2.) Sketch the graph of... (answered by Theo)
A completes one work in20 days. B cmpletes the same work in 25 days while C completes the (answered by ankor@dixie-net.com)
X, Y and Z can do a job in 10 days. X leaves after working with Y and Z for 4 days, and... (answered by richwmiller)
A and B can do a piece of work in 6 days,B and c together in 10 days,c and A together in... (answered by lwsshak3)
An experienced bricklayer constructs a small wall in 3 hours. the apprentice completes... (answered by nyc_function)
John works 5 days a week. On Monday he completes 1/2 of his week’s work. On Tuesday he... (answered by vksarvepalli)