SOLUTION: a man can complete a piece of work in 9 days but with the help of his son, he can do it in 6 days.the taken by his son to do it alone is
Algebra.Com
Question 672511: a man can complete a piece of work in 9 days but with the help of his son, he can do it in 6 days.the taken by his son to do it alone is
Answer by nerdybill(7384) (Show Source): You can put this solution on YOUR website!
a man can complete a piece of work in 9 days but with the help of his son, he can do it in 6 days.the taken by his son to do it alone is
.
Let x = time (days) it takes the son alone
then
6(1/9 + 1/x) = 1
multiplying both sides 9x:
6(x + 9) = 9x
6x + 54 = 9x
54 = 3x
18 days = x
RELATED QUESTIONS
A man can do a piece of work in 5 days,but the help of his son he can do it in 3 days in... (answered by richwmiller)
One man and 2 boys can do a piece of work in 12 days, which can also be done by 3 men and (answered by 303795)
A man can do a piece of work in 9 hours. After he worked 3 hours alone, he was joined by... (answered by oberobic)
one man & 2 boys can do a piece of workin 12 days, which can also done by 3 men & 1 boy... (answered by stanbon)
a man does half as much work as his son in three - four of the time .if they take 18 days (answered by Theo)
alone. How long would it take each of them to paint the house alone?A man and his son... (answered by stanbon)
A man can do a job in 9 days and his son can do the same job in 16 days. They start... (answered by ptaylor)
A farmer can plow his field by himself in 15 days. If his son helps, they can do it in 6... (answered by dkppathak)
Doy and his son can do a job in 4 1/2 days. After that they have worked for 3 days, Doy... (answered by ankor@dixie-net.com)