SOLUTION: A piece of work can be done by Beejay in 4 days, by Ryan in 7 days, and by Buds in 10 days. If the three work together, how long will it take them to do the job?
Algebra.Com
Question 656105: A piece of work can be done by Beejay in 4 days, by Ryan in 7 days, and by Buds in 10 days. If the three work together, how long will it take them to do the job?
Answer by nerdybill(7384) (Show Source): You can put this solution on YOUR website!
A piece of work can be done by Beejay in 4 days, by Ryan in 7 days, and by Buds in 10 days. If the three work together, how long will it take them to do the job?
.
Let x = time (days) it takes for all three
then
x(1/4 + 1/7 + 1/10) = 1
multiplying both sides by 140:
x(140/4 + 140/7 + 140/10) = 140
x(35 + 20 + 14) = 140
x(69) = 140
x = 140/69
x = 2.029 days
or
x = 2 days and 0.7 hours
or
x = 2 days and 42 minutes
RELATED QUESTIONS
A piece of work can be done by A,B and C working together in 4 days. it can also be... (answered by Edwin McCravy)
10 men and 15 women can do a piece of work in 30 days, Calculate in how many days can the (answered by richwmiller,Alan3354)
7) A, B, & C can do a piece of work in 10, 9, 15 days respectively. They started the work (answered by richwmiller)
Person A can do a piece of work in 10 days. After he has worked for 2 days, B comes and... (answered by scott8148)
A piece of work can be done by 6 men and 5 women in 6 days or 3 men and 4 women in 10... (answered by ikleyn,Edwin McCravy)
peter can do a piece of work
in 8 days sam in 10 days and john in 16 days
sam adams... (answered by josgarithmetic)
a piece of work can be done in 34 days by 25 men. After 16 days, 10 men quit work. in... (answered by khwang)
If 1 man or 2 women or 3 boys can do a piece of work in 44 days, then the same piece of... (answered by ptaylor)
A piece of work can be done by 5 men in 10 days. After 4 days, 3 men were transferred to... (answered by 12217B)