Answer by ptaylor(2198) (Show Source): You can put this solution on YOUR website!
Inverse variation means that t=k/n where t is time, n is number of people working on the job and k is the constant of proportionality. First, we need to find the value of k and the problem allows us to do that:
6=k/20
Solving for k, we get:
k=120
Now for our problem:
t=120/30
t=4 hours---time required for 30 people to do the job.
CK
4=k/30
k=120
Hope this helps---ptaylor
RELATED QUESTIONS
the time t required to do a certain job varies inversely as the number of people in... (answered by ankor@dixie-net.com)
Suppose that it takes 9 hours for four workers to roof a house. If the time required to... (answered by ankor@dixie-net.com)
BUILDING BRICK WALL:
The time, t, required to build a brick wall varies inversely as the (answered by oberobic)
Find the time for two people working together to complete half a task if it takes them 7... (answered by ankor@dixie-net.com)
The time required to complete a job varies inversely as the number of people working. It... (answered by fractalier)
Set up a system of three equations with three variables.
A, B, and C complete a task in... (answered by richwmiller)
The time T to do a job varies inversely as the number of
people P working. It takes... (answered by richwmiller)
The time T required to do a job varies inversely as the number of people P working. It... (answered by mananth)
Inverse variation, Solve following problem
1. The time t required to do a job varies... (answered by math_helper,Theo)