Question 601833: if it takes 7 men 3 hours to dig a hole, how long will it take 2 men ?
Answer by josmiceli(19441) (Show Source): You can put this solution on YOUR website!
It takes 7 men 3 hours to dig 1 hole
It would take 1 man 7 times longer to dig 1 hole, so
It takes 1 man 21 hours to dig 1 hole
Twice as man men can do the same job in half the time, so
It takes 2 men 10.5 hours to dig 1 hole
RELATED QUESTIONS
if 4 men work for 6 hours a day for 3 days to dig a hole. how long will it take 12 men to (answered by macston)
If it takes 6 men 4 days to dig a hole 3 metres deep, how long will it take for 10 men to (answered by josgarithmetic,ikleyn)
if it takes 4 men 12 days to dig a hole, how long would it take 6... (answered by ptaylor)
2. If it takes 6 men working 6 hours each to dig a hole in the ground, then how long will (answered by venugopalramana)
If it takes 8 men 9 hours to dig a hole in 20 minutes,how long would it take 10 men to... (answered by josgarithmetic)
If it takes 8 men 9 hours to dig a hole in 20 meters deep,how long would it take 10 men... (answered by ankor@dixie-net.com)
Answer this school maths question - If it takes three men three hours to dig a hole, how... (answered by ankor@dixie-net.com)
10 men take 7 days to dig a hole. how many days will it take 4 men to dig the same hole... (answered by stanbon)
If it takes two men two hours to dig a hole 3 metres long, 3 metres wide and 3 metres... (answered by josgarithmetic)