SOLUTION: Mr. Samson can sort the bins in 12 days. If Joe helps him, it only takes 4 days. How long would it take for Joe to sort the bins himself?

Algebra.Com
Question 594710: Mr. Samson can sort the bins in 12 days. If Joe helps him, it only takes 4 days. How long would it take for Joe to sort the bins himself?
Answer by richwmiller(17219)   (Show Source): You can put this solution on YOUR website!
4/12+4/x=1
1/3+4/x=1
4/x=2/3
x=6 days

RELATED QUESTIONS

Mr. Samson can sort the bins in 12 days. If Joe Helps him, it takes only 4 days. How... (answered by stanbon)
Susan can sort the office mail in 15 minutes but if Kathy helps, they can sort the mail... (answered by richwmiller,ankor@dixie-net.com)
it takes doug 6 days to roof a house. if his son helps him,the job can be done in 4 days. (answered by chitra,Edwin McCravy)
carmen can retile the kitchen floor in 8 hours but if joe helps her, the job will... (answered by checkley79)
It takes Doug 3 days to reroof a house. If Doug's son helps him, the job can be completed (answered by josgarithmetic,greenestamps)
Joe can do a job in 12 days after he has worked for 4 days he is joined by Casey and it... (answered by scott8148)
Joe can paint their house in 6 days. His father can do the same job in 12 days. How long... (answered by josmiceli)
A postal worker can sort a days worth of mail in 8 hours. with her supervisor helping, it (answered by nyc_function)
Jose takes twice as long as Maria to sort the mail. Together they can sort the mail in 8... (answered by richwmiller)