SOLUTION: Two crews can complete a job in 45 days when working together. On their own, one crew completes the same job in 80 days. How long would it take the other crew to complete the same
Algebra.Com
Question 544724: Two crews can complete a job in 45 days when working together. On their own, one crew completes the same job in 80 days. How long would it take the other crew to complete the same job on their own?
Answer by ankor@dixie-net.com(22740) (Show Source): You can put this solution on YOUR website!
Two crews can complete a job in 45 days when working together.
On their own, one crew completes the same job in 80 days.
How long would it take the other crew to complete the same job on their own?
:
let t = time required by the 2nd crew alone
let the completed job = 1
:
The two crews each do a fraction of the job, the two fractions add up to 1
:
+ = 1
multiply by 80t, results:
45t + 80(45) = 80t
3600 = 80t - 45t
3600 = 35t
t =
t = 102.857 days, crew two alone
:
:
:
See if that checks out
+ =
.5625 + .4375 = 1
RELATED QUESTIONS
an electrical contractor is planning to complete a lighting job by useing two separate... (answered by richwmiller)
One crew can detassel a field of corn in 6 days. Another crew can do the same job in 4... (answered by ankor@dixie-net.com)
A 3-men crew can do a certain job in 4 hours, while it takes a 4-men crew to do the same... (answered by ankor@dixie-net.com)
A and B working together can finish a job in T days. If A works alone and completes the... (answered by Edwin McCravy,josmiceli)
Two digging crews are competing for a job the first team shows they can dig a foundation... (answered by josgarithmetic)
All members of a crew work at the same pace. If only 4 of them are working, they complete (answered by josgarithmetic)
Working together, two men can do a job in 20 days. Working alone, however, it would take... (answered by ankor@dixie-net.com)
One road crew can pave a section of highway in 15 h. A second crew can do the same job in (answered by josgarithmetic,ikleyn,Alan3354,greenestamps)
if sam can do a certian job in 3 days while it takes fred 6 days to do the same job how... (answered by solver91311)