SOLUTION: Bill can paint a house in 5 days and Samantha can paint the same house in 7 days. How long will it take them, working together, to paint the house?
Algebra.Com
Question 517488: Bill can paint a house in 5 days and Samantha can paint the same house in 7 days. How long will it take them, working together, to paint the house?
Answer by ankor@dixie-net.com(22740) (Show Source): You can put this solution on YOUR website!
Bill can paint a house in 5 days and Samantha can paint the same house in 7 days.
How long will it take them, working together, to paint the house?
:
Let t = time required when they work together
Let the completed job = 1
:
A typical shared work equation.
Each will do a fraction of the work, the two fractions must add up to 1
:
+ = 1
multiply by 35 to clear the denominators, results
7t + 5t = 35
12t = 35
t = 35/12
t = 2 ~ 2.9167 days working together,
RELATED QUESTIONS
If one painter can paint a house in 8 days and another painter can paint the same house... (answered by richwmiller,jsmallt9)
if one painter can paint a house in 5 days and another painter can paint the same house... (answered by edjones)
If one painter can paint a house in 5 days and another painter can paint the same house... (answered by ewatrrr)
BILL CAN PAINT A HOUSE IN 2 DAYS, GEORGE CAN PAINT THE SAME HOUSE IN 3 DAYS, AND JEFF... (answered by addingup)
Sarah can paint a house in 6 days and John can paint that same huse in 4 days, how long... (answered by stanbon)
Jack can paint a house in 4 days. Maven can paint the same house in 5 days. How long... (answered by solver91311)
David can paint the outside of a house in 12 hr. Bill can paint the same house in 9 hr. (answered by stanbon,richwmiller)
Ten workers can paint a house in six days. Working at the same rate, how many days will... (answered by Alan3354)
Person A can paint a house 3 times as fast as person B. Working together they can paint... (answered by richwmiller)