Question 490214: A can do a work in 36 days, B can do the work in 72 days and C can do the work in 78 days. The three take turns in working, i.e. A works on the first day, B works on the second day, C on the third day and so on. Which day will they finish the work?
Answer by ankor@dixie-net.com(22740) (Show Source): You can put this solution on YOUR website!
A can do a work in 36 days, B can do the work in 72 days and C can do the work in 78 days.
The three take turns in working, i.e. A works on the first day, B works on the second day, C on the third day and so on.
Which day will they finish the work?
:
Let d = the no. of days for the three men to do the work
Let the completed job = 1
:
+ + = 1
Multiply by 2808 to clear the denominators
78(d) + 39(d) + 36(d) = 2808
26d + 13d + 12d = 2808
51d = 2808
d =
d = 55.06, therefore completion will occur on the 56th day
RELATED QUESTIONS
A does 3/10 of a work in 6 days .He then calls in B and they finish the work in 7 days... (answered by ankor@dixie-net.com)
A, B, and C can do a piece of work in 10 days. A and B can do it in 12 days, A and C in... (answered by josmiceli)
A,B, and C can do a piece of work in 10 days. A and B can do it in 12 days, A and C in 20 (answered by dkppathak)
A,B and C do a piece of work in 10 days. A and B can do it in 12 days. A and C in 20... (answered by savvyhush23)
A,B and C can finish a job in 6 days. If B and C work together, the job will take 9 days; (answered by stanbon,harshachittar)
A and B can do a piece of work in 42 days, B and C in 31 days, and A and C in 20 days.... (answered by ptaylor,Edwin Parker)
A can do a piece of work in 36 days, B in 54 days and C in 72 days. All of them began... (answered by stanbon,scott8148)
A,B and C can do a piece of work together in 15 days. B alone can do in 30 days and C... (answered by ankor@dixie-net.com)
A and B can do a job in 12 days and B and C can do it in 16 days. A and B started... (answered by josgarithmetic)