SOLUTION: Peter can do a whole job in half the time it takes Henry to do it. Together they can finish the job in 10 days. How many days will it take Peter to do the job alone?
Algebra.Com
Question 474870: Peter can do a whole job in half the time it takes Henry to do it. Together they can finish the job in 10 days. How many days will it take Peter to do the job alone?
Answer by karaoz(32) (Show Source): You can put this solution on YOUR website!
This is a nice problem.
Let p = the number of days required for Peter alone to do a whole job.
Let h = the number of days required for Henry alone to do a whole job.
There is one job and Peter can do 1/p parts of the job in one day.
Henry can do 1/h parts of the job in one day.
Together they can do 1/p + 1/h parts of the job in one day.
Together they can finish the job in 10 days, which means that 1/h + 1/p = 1/10.
This can be represented (after multiplying the equation by 10ph) as:
10p + 10h = ph.
The second equation comes from the first sentence: p = h/2.
Since we need only to find p it will be better to express h in terms of p.
From p = h/2, we have h = 2p.
Substitute this into
10p + 10h = ph, to get
10p + 20p = p(2p).
Solve for p:
30p = 2p2
Divide both sides of the equation by p (assuming p is not equal to 0) to get:
30 = 2p.
Finally,
p = 15 days.
Answer: It will take 15 days for Peter to do the job alone.
RELATED QUESTIONS
Peter can do a whole job in half the time it takes Henry to do it. Together they can... (answered by josgarithmetic,MathTherapy)
Jose can do a certain job in 10 days, and Roy can do the same job in 12 days. If two men... (answered by ikleyn,Alan3354,greenestamps)
Roxanne, Peter, and Cal can complete a job in three days. Roxanne can do the job in 8... (answered by josgarithmetic,MathTherapy)
it takes mary 3 hours to do a job that it takes jane. If they work together, they can... (answered by richwmiller)
it takes mary 3 hours more to do a job than it takes jane. if they work together,they can (answered by josmiceli)
If Harry can do a job in 2 days, and Sally can do the job in 4 days, and Henry can do... (answered by stanbon)
Danny can finish a job in 10 days. Together, Miguel and Danny can finish the same job in... (answered by rothauserc,ikleyn)
It takes worker A six days longer as it takes worker B to finish a certain job. Working... (answered by greenestamps,ikleyn)
Tom takes 3 days to do a piece of work while jerry takes only one day for the same.... (answered by ikleyn)