SOLUTION: can someone help me plssssssssss :)?
it takes carolyn 4 hr to type a final exam. it takes Elise 3 hr to do the same job. How long would it take them, working together, to do the
Algebra.Com
Question 469308: can someone help me plssssssssss :)?
it takes carolyn 4 hr to type a final exam. it takes Elise 3 hr to do the same job. How long would it take them, working together, to do the typing?
Found 2 solutions by nerdybill, solver91311:
Answer by nerdybill(7384) (Show Source): You can put this solution on YOUR website!
it takes carolyn 4 hr to type a final exam. it takes Elise 3 hr to do the same job. How long would it take them, working together, to do the typing?
.
Let x = time (hours) it takes for both
then
x(1/4 + 1/3) = 1
multiplying both sides by 12:
x(3 + 4) = 12
x(7) = 12
x = 12/7
x = 1.7 hours
or
x = 1 hour and 43 minutes
Answer by solver91311(24713) (Show Source): You can put this solution on YOUR website!
If A can do a job in x time periods, then A can do
of the job in 1 time period. Likewise, if B can do the same job in y time periods, then B can do
of the job in 1 time period.
So, working together, they can do
of the job in 1 time period.
Therefore, they can do the whole job in:
time periods.
John

My calculator said it, I believe it, that settles it
RELATED QUESTIONS
It takes Carolyn 4 hour to type a final exam. It takes Elise 3 hour to do the same job.... (answered by richwmiller)
Working together, Carla and Elise can cut and split a cord of wood in 4 hours. Working... (answered by checkley77)
Ron Wood can paint a room in 6 hr working alone. If his son, Jason, helps him, the job... (answered by ankor@dixie-net.com)
If it takes a girl 12 hr to do a job, what is her... (answered by Theo)
It takes Gary 1 hr. to milk all the cows, and it takes Dana 1.5 hrs. How long will it... (answered by richwmiller)
Cindy can paint a house in 3 hr less time than Dustin. Together, it takes 18 hrs. How... (answered by nerdybill)
Jeff takes 5 hr longer to build a fence than it takes Bill. When they work together, it... (answered by checkley77)
Jeff takes 5 hr longer to build a fence than it takes Bill. When they work together, it... (answered by ankor@dixie-net.com,solver91311)
Jeff takes 5 hr longer to build a fence than it takes Bill. When they work together, it... (answered by scott8148)