Answer by rwm(914)   (Show Source): You can put this solution on YOUR website!
How many times can you pour the same driveway?
x/6+x/7=1
7x+6x=42
13x=42
x=42/13=3.23 hours

RELATED QUESTIONS

Shawna can pour a large concrete driveway in 6 hours. Dan can pour the same driveway in 7 (answered by amarjeeth123)
Alex can pour concrete on a walkway in x hours alone while Andy can pour concrete on the... (answered by richwmiller)
Working together, Adam and Chris can reseal a driveway in 6 hours. Working alone, Adam... (answered by mananth)
Bret can plow his driveway in eight hours, his neighbor can plow his driveway in 12... (answered by stanbon)
A contractor has been hired to pour a rectangular concrete patio. How can he be sure that (answered by ikleyn)
Joan can shovel a certain driveway in 50 minutes. If mary can shovel the same driveway... (answered by nerdybill)
Joan can shovel a certain driveway in 50 minutes. If Mary can shovel the same driveway... (answered by ewatrrr)
Ronald can shovel the driveway in 6 hours, but if his brother Donald helps it would take... (answered by josgarithmetic)
Shawna can mop a warehouse in 12 hours. Totsakam can mop the same warehouse in 9 hours.... (answered by stanbon)