SOLUTION: two welders who work at the same rate are welding the girders of a building. after they work together for 10 h, one of the welders quits. the second welder requires 20 more hours t

Algebra.Com
Question 446856: two welders who work at the same rate are welding the girders of a building. after they work together for 10 h, one of the welders quits. the second welder requires 20 more hours to complete the welds. find the time it would have taken one of the welders, working alone, to complete the welds.
Answer by robertb(5830)   (Show Source): You can put this solution on YOUR website!

==>
==>
==>
==> x = 40 hours, the time it would take either one of them to finish the job alone.

RELATED QUESTIONS

Two welders who work at the same rate are welding the girders of a building. After they... (answered by ankor@dixie-net.com)
​ two welders work total of 60 hours on a project. One welder made $32/h, while the (answered by ikleyn)
two machines work at the same rate. after they work together for 7 h, one machine breaks (answered by ankor@dixie-net.com)
two machines that fill cereal boxes work at the same rate. after they work together for 7 (answered by nerdybill)
Two welders working together can complete a job in 6 h. One of the welders, working... (answered by josgarithmetic)
A bricklayer does one day of work building a wall. On the second day, he is joined by a... (answered by ankor@dixie-net.com)
two welders working together can complete a job in 6 hrs. one of the welders, working... (answered by josmiceli)
In the design of a bridge, an engineer determines that four fewer 18-m girders are needed (answered by Alan3354)
Two machines fill cereal boxes at the same rate. After the two machines work together... (answered by drk)