SOLUTION: a mason can construct a retaining wall in 10 h. with the mason's apprentice assisting, the task takes 6 h. how long would it take the apprentice, working alone, to construct the wa

Algebra.Com
Question 446852: a mason can construct a retaining wall in 10 h. with the mason's apprentice assisting, the task takes 6 h. how long would it take the apprentice, working alone, to construct the wall?
Answer by robertb(5830)   (Show Source): You can put this solution on YOUR website!

==>
==>
==>
==> x = 15 hours for the apprentice.

RELATED QUESTIONS

A mason can construct a retaining wall in 15 hours. With the mason's apprentice... (answered by josmiceli)
A cement mason can construct a retaining wall in 12 h. A second mason requires 10 h to do (answered by josgarithmetic,ikleyn)
A cement mason can construct a retaining wall in 12 h. A second mason requires 10 h to do (answered by ikleyn)
A mason can construct a retaining wall in 10 h. The mason's experienced apprentice can do (answered by jorel555)
A building contractor employs a master mason, a journeyman mason and an apprentice mason. (answered by ankor@dixie-net.com)
An apprentice mason takes 8h longer to build a small fireplace than an experienced mason. (answered by Paul)
A mason can build a wall in 10 hours. An apprentice can build a wall in 15 hours. How... (answered by checkley77)
a mason can build a wall in 6 hours less than an apprentive. together they can build the... (answered by ptaylor)
a mason can build a wall in six hours less than an apprentice. together they can build... (answered by josgarithmetic)