SOLUTION: Jane, Paul and Peter can finish painting the fence in 2 hours. If Jane does the job alone she can finish it in 5 hours. If Paul does the job alone he can finish it in 6 hours. How

Algebra.Com
Question 410571: Jane, Paul and Peter can finish painting the fence in 2 hours. If Jane does the job alone she can finish it in 5 hours. If Paul does the job alone he can finish it in 6 hours. How long will it take for Peter to finish the job alone?
Found 2 solutions by ewatrrr, edjones:
Answer by ewatrrr(24785)   (Show Source): You can put this solution on YOUR website!

Hi
Let x represent the time it would take Peter solo
Question states*** Per hour the Equalizer
1/5 + 1/6 + 1/x = 1/2
Solving for x
6x + 5x + 30 = 15x |Multiplying thru by 30x so as all denominators = 1
30 = 4x
x = 30/4 or 7.5 hrs, time it would take Peter solo
CHECKING our Answer***
6/30 + 5/30 + 4/30 = 15/30 = 1/2
Answer by edjones(8007)   (Show Source): You can put this solution on YOUR website!
In one hr jane doe 1/5 the job, paul does 1/6 and peter does 1/x and together they can do 1/2 the job in one hr.
1/5 + 1/6 + 1/x = 1/2
6x+5x+30=15x multiply each side by 30x LCM.
-4x=-30
x=15/2 hrs
.
Ed

RELATED QUESTIONS

Jane,Paul and Peter can finish painting the fence in 2 hours. If Jane does the job alone... (answered by scott8148)
Jane, Paul, and Peter can finish painting the fence in two hours. If Jane does the job... (answered by mananth)
I had a question about a work word problem. It says: Jane, Paul, and Peter can finish a... (answered by stanbon,solver91311)
Tina and Jane can paint an apartment in 5 hours together. If Tina can do the same job... (answered by richwmiller)
it takes mary 3 hours to do a job that it takes jane. If they work together, they can... (answered by richwmiller)
it takes mary 3 hours more to do a job than it takes jane. if they work together,they can (answered by josmiceli)
kristy can mow a lawn in 1 hour less time than her sister jane. together they can finish... (answered by edjones)
Pat and Jane want to paint a fence, pat can paint the fence by himself in 3 hours, jane... (answered by richwmiller,josmiceli)
Mark and Bert together can finish the job in 4 hours. How fast can Bert finish the job... (answered by ptaylor)