SOLUTION: It takes jane 15 hours to paint a house. It takes john 18 hours to paint the same house. How long will it take both of them, working together, to paint the house?
Algebra.Com
Question 410057: It takes jane 15 hours to paint a house. It takes john 18 hours to paint the same house. How long will it take both of them, working together, to paint the house?
Answer by nerdybill(7384) (Show Source): You can put this solution on YOUR website!
It takes jane 15 hours to paint a house. It takes john 18 hours to paint the same house. How long will it take both of them, working together, to paint the house?
.
Let x = time(hours) it takes for both
then
x(1/15 + 1/18) = 1
multiplying both sides by (15)(18):
x(1/15 + 1/18) = 1
x(18 + 15) = (15)(18)
x(33) = 270
x = 8.182 hours
or
x = 8 hours and 11 minutes
RELATED QUESTIONS
if jane paints a house in 4 hours and john paints the same house in 6 hours how long will (answered by solver91311)
if Jane takes 5 hours to paint a house and John takes 6 hours to paint a house. How long... (answered by rapaljer)
if it takes sally 4 hours to paint a house and it take john 6 hours to paint the same... (answered by Paul)
It takes Sal 5 hours to paint a house. It takes Mary 3 hours to paint the same house. How (answered by junior403)
It takes Sal 5 hours to paint a house. It takes Tom 3 hours to paint the same house. How (answered by Alan3354)
It takes Sal 5 hours to paint a house. It takes Pal 3 hours to paint the same house. How... (answered by ptaylor)
if maria paint a house in 4 hours, and john takes 6 hours topaint the same house.. how... (answered by Alan3354)
IF IT TAKES SALLY 4 HOURS TO PAINT A HOUSE AND IT TAKES JOHN 6 HOURS TO PAINT THE SAME... (answered by funmath)
It takes Aaron 20 hours to paint a house. It takes Bob 30 hours to paint the same house.... (answered by jim_thompson5910,ikleyn,Alan3354)