Question 375331: a mason's helper requires 4 hours more to pave a concrete walk than it takes the mason. the two worked together for 3 hours when the mason war called away. the helper completed the job in 2 hours. how long would it take each to do the same job working alone?
Answer by edjones(8007) (Show Source): You can put this solution on YOUR website!
Mason does job in m hours. Helper does job in m+4 hours.
t=time in hrs
1/m + 1/(m+4)=(2m+4)/(m^2+4m) = 1/t
3 * (2m+4)/(m^2+4m) = (6m+12)/(m^2+4m) = 3/t
1 - (6m+12)/(m^2+4m) time remaining [1 - 3/t]
2 * 1/(m+4)= 1 - (6m+12)/(m^2+4m)
2/(m+4)=1 - (6m+12)/(m(m+4))
2m=m^2+4m-6m-12
m^2-4m-12=0
(m-6)(x+2)=0
m=6 hr
m+4=10 hr
.
Ed
RELATED QUESTIONS
A brick mason requires 12 hours to lay a garden wall by himself. After the mason and his... (answered by richwmiller)
A mason can make a concrete walk in 6 hours. His helper requires 9 hours to do the same... (answered by nyc_function)
A mason can lay the bricks in a sidewalk in 10 hours. The mason's apprentice requires 12... (answered by rothauserc)
An apprentice mason takes 8h longer to build a small fireplace than an experienced mason. (answered by Paul)
a mason can make a wall in 6 hours. His helper takes 9 hours. In how many hours can... (answered by checkley75)
A mason can lay the bricks in a sidewalk in 12 hours. The mason's apprentice requires 16 (answered by stanbon)
A mason can lay the bricks in a sidewalk in 14 hours. The mason's apprentice requires 22... (answered by jorel1380)
A mason and his assistant work on a fireplace for 6 hours together. Then the mason... (answered by Boreal)
One cement mason can lay a cement foundation in 8 hours, while it takes a second 12 hours (answered by josgarithmetic,JulietG)