Question 3705: a piece of work can be done in 34 days by 25 men. After 16 days, 10 men quit work. in how many more days can the rest finish the work?
Answer by khwang(438) (Show Source): You can put this solution on YOUR website!
Consider the whole as 1.
The remaining work is 1 - 16/34 = 1 - 8/17 = 9/17.
Each man can finish 1/(34*25) = 1/ 850 of the whole work in one day.
So, the remaining 15 men can finish 15/850 = 3/170 of the whole work in one day.
Hence, it takes (9/17) / (3/170) = 9*10/3 = 30 more days to finish the rest
of the work.
Kenny
RELATED QUESTIONS
A piece of work can be done by 40 days by 25 men. After 16 days, 13 men are transferred.... (answered by Finavon)
a piece of work can be done in 48 days by 40 men. after 15 days, 16 men were transferred. (answered by richwmiller)
A piece of work can be done by 5 men in 10 days. After 4 days, 3 men were transferred to... (answered by 12217B)
A piece of work can be done in 48 days by 40 men. After 15 days, 16 men were transferred. (answered by stanbon,jrfrunner)
a piece of work can be done by 40 men in 48 days. after 15 days, 18 men were transferred... (answered by stanbon)
A piece of work can be done by 6 men and 5 women in 6 days or 3 men and 4 women in 10... (answered by ikleyn,Edwin McCravy)
twenty four men are engaged to do a piece of work in 38 days. after 10 days, 8 men stop... (answered by Alan3354)
a piece of work can be done by 40 men in 48 days, after 15days, 18 men were transferred... (answered by ankor@dixie-net.com)
1.'A' works twice as fast as 'B'. If both of them together take 6 days to complete the... (answered by josmiceli,vvnrichards)