Question 364018: Solve the following problem algebraically. That is, set up an equation and solve it. Be sure to label clearly what the variable represents.
A bricklayer can complete a wall in 7 days, whereas his assistant can do the same size wall in 3 days. Working together, how long will it take for them to complete the wall?
Answer by robertb(5830) (Show Source): You can put this solution on YOUR website!
Let x = # days two of them would take to finish a wall. Then
,
,
, or 2.1 days.
RELATED QUESTIONS
Solve the following problem algebraically. That is, set up an equation and solve it. Be... (answered by nerdybill)
Set up an inequality and solve it. Be sure to label clearly what the variable represents. (answered by checkley77)
I currently assume the answer to this question is 1.5 because I did it in my head but I... (answered by Alan3354,ikleyn)
I'm not sure how to set up the following word problem. Once it is set up I should be able (answered by josgarithmetic)
For the problem given below, set up an equation and solve. Show all work (including what (answered by josgarithmetic)
set up the equation to solve the following word problem. the sum of an integer and its... (answered by richwmiller)
Using this model, find the percentage of participation that can be expected if $5 million (answered by richard1234)
For the problem given below, set up an equation and solve. Show all work (including what (answered by macston)
I am stuck on this problem, any help will be greatly appreciated.
Two consecutive odd... (answered by stanbon,Alan3354)