SOLUTION: A roofing crew can roof a house in 10 hours. If a second crew was added, the job would take 6 hours. How long would it take the second crew to roof the house alone? Thank you
Algebra.Com
Question 359564: A roofing crew can roof a house in 10 hours. If a second crew was added, the job would take 6 hours. How long would it take the second crew to roof the house alone? Thank you
Answer by CharlesG2(834) (Show Source): You can put this solution on YOUR website!
A roofing crew can roof a house in 10 hours. If a second crew was added, the job would take 6 hours. How long would it take the second crew to roof the house alone? Thank you
total time T in hours = 1 job/(1 job/F + 1 job/S)
where F is the first roofing crew's time in hours, F = 10 hours
and S = time in hours for the second crew, solve for S
total Time T = 6 hours
6 hours = (1 job)/[(1 job)/(10 hours) + (1 job)/S]
units: hours = job/(job/hours) = job * hours/job = hours
6 = 1/(1/10 + 1/S) (removed units)
6 = 1/(S/10S + 10/10S) (gave each fraction a common denominator)
6 = 1/[(S + 10)/10S]
6 = 10S/(S + 10) (took the reciprocal)
6(S + 10) = 10S
6S + 60 = 10S (distributed the 6)
6S - 10S = -60
-4S = -60 (brought S's to the left, and the 60 to the right)
4S = 60 (divided by -1)
S = 15 hours for the second crew to roof the house alone
RELATED QUESTIONS
One roofing crew of 5 can finish A 3,800-foot roof in 15 hours, ans another crew of 6 can (answered by richwmiller)
in checking records finds that crew A can pave a contract length of highway in 8 hours.... (answered by scott8148)
A 3-men crew can do a certain job in 3 weeks and 2 days, if we are to hire 4 men crew... (answered by josmiceli)
One roofing crew can finish a 2,800-square-foot roof in 12 hours, and another crew can do (answered by josgarithmetic)
A crew of 2 could put siding on a house in 30 hours. Another crew of 3 could do the same... (answered by josmiceli,greenestamps)
A crew of 6 can complete a job in 8 hours. How many hours would it take a group of 4 to... (answered by rfer,vleith)
One road crew can pave a section of highway in 15 h. A second crew can do the same job in (answered by josgarithmetic,ikleyn,Alan3354,greenestamps)
A 3-men crew can do a certain job in 4 hours, while it takes a 4-men crew to do the same... (answered by ankor@dixie-net.com)
It takes one crew 8 hours to clean an auditorium after an event. If a second crew helps,... (answered by richwmiller)