SOLUTION: It takes a boy 60 minutes to mow the lawn, but his sister can mow it in 90 minutes. How long would it take them to mow the lawn if they worked together, using two lawn mowers?

Algebra ->  Algebra  -> Rate-of-work-word-problems -> SOLUTION: It takes a boy 60 minutes to mow the lawn, but his sister can mow it in 90 minutes. How long would it take them to mow the lawn if they worked together, using two lawn mowers?      Log On

Ad: Algebra Solved!™: algebra software solves algebra homework problems with step-by-step help!
Ad: Algebrator™ solves your algebra problems and provides step-by-step explanations!

   


Question 340842: It takes a boy 60 minutes to mow the lawn, but his sister can mow it in 90 minutes. How long would it take them to mow the lawn if they worked together, using two lawn mowers?
Answer by stanbon(57240) About Me  (Show Source):
You can put this solution on YOUR website!
It takes a boy 60 minutes to mow the lawn, but his sister can mow it in 90 minutes. How long would it take them to mow the lawn if they worked together, using two lawn mowers?
------------------
boy rate = 1/60 job/min
girl rate= 1/90 job/min
---
together rate = 1/x job/min
==========================
Equation:
rate + rate = together rate
1/60 + 1/90 = 1/x
Multiply thru by 180x to get:
3x + 2x = 180
5x = 180
x = 36 minutes (time to mow together)
==============