SOLUTION: One conveyor belt can move 1000 boxes in 12 minutes. Another can move 1000 boxes in 9 minutes. If another conveyor is added and all three are used, the boxes are moved in 3 minut

Algebra.Com
Question 33803: One conveyor belt can move 1000 boxes in 12 minutes. Another can move 1000 boxes in 9 minutes. If another conveyor is added and all three are used, the boxes are moved in 3 minutes. How long would it take the third conveyor belt alone to do the same job?
Answer by stanbon(75887)   (Show Source): You can put this solution on YOUR website!
1st belt Data:
time=12 min ; rate = 1/12 job/min
2nd belt Data:
time=9 min ; rate = 1/9 job/min
3rd belt Data:
time= x min ; rate = 1/x job/min
Together Data:
time= 3 min ; rate = 1/3 job/min
EQUATION:
rate + rate + rate= 1/3
1/12 + 1/9 + 1/x = 1/3
Multiply thru by 36x to get:
3x + 4x + 36 = 12x
5x=36
x=7.2 minutes (time for the 3rd belt working alone)
Cheers,
Stan H.

RELATED QUESTIONS

One conveyor belt can move 1000 boxes in 12 minutes. Another can move 1000 boxes in 10... (answered by ankor@dixie-net.com)
One conveyor belt can move 1000 boxes in 11 minutes. Another can move 1000 boxes in 3... (answered by greenestamps,josgarithmetic)
Conveyor belt # 1 can move 1,000 boxes in 8 minutes. Conveyor belt #2 can move 1,000... (answered by mananth)
A conveyor belt moves boxes of fruit at the rate of two tonnes in five minutes, while a... (answered by mananth)
In 12 minutes, a conveyor belt can move 1,000 bushels of corn into a storage bin. A... (answered by josgarithmetic)
in 9 minutes, a conveyor belt can move a 1.00 bushels of corn into a storage bin. A... (answered by ptaylor)
In 9 minutes, a conveyor belt can move 1,000 bushels of corn into a storage bin. A... (answered by josgarithmetic)
In three minutes a conveyor belt moves 800 pounds of recyclable aluminum from a delivery... (answered by Alan3354)
In 2 minutes, a conveyor belt can move 300 pounds of recyclable aluminum from the... (answered by robertb)