SOLUTION: It takes Jack 9 hours longer to paint the fence than Mike. Together, they can paint the fence in 20 hours. How long will it take each person to paint the fence?
I tried solvin
Algebra.Com
Question 300150: It takes Jack 9 hours longer to paint the fence than Mike. Together, they can paint the fence in 20 hours. How long will it take each person to paint the fence?
I tried solving this as an inverse work-rate problem using
1/A + 1/B = 20 but I can't get it to work.
Found 2 solutions by nerdybill, richwmiller:
Answer by nerdybill(7384) (Show Source): You can put this solution on YOUR website!
It takes Jack 9 hours longer to paint the fence than Mike. Together, they can paint the fence in 20 hours. How long will it take each person to paint the fence?
.
Let m = hours it takes Mike to paint fence
then
m+9 = hours it takes Jack to paint fence
.
20(1/m + 1/(m+9)) = 1
Multiplying both sides by m(m+9):
20((m+9) + m) = m(m+9)
20(2m+9) = m(m+9)
40m+180 = m^2+9m
0 = m^2-31m-180
0 =(x-36)(x+5)
x = {36, -5}
Throw away the negative solution leaving:
x = 36 hours (Mike)
.
Jack:
x+9 = 45 hours
Answer by richwmiller(17219) (Show Source): You can put this solution on YOUR website!
20/x+20/(x+9)=1
The one means one job
We are trying to find what fraction of the job Jack does and what fraction of the job Mike does. Together it has to add up to one whole job or 100% of the job
20/x is how much Mike does in the4 20 hour job
20/(x+9) is the part Jack does since he takes longer.
jack can do it in x+9 hours and so he does 1/(x+9) in one hour.
in 20/(x+9) he does his part of the 20 hour job
so we multiply 20/x by (x+9)/(x+9)
and we multiply 20/(x+9) by x/x
(20*(x+9)+20x)/x*(x+9)=1
(40x+180)=x^2+9x
0=x^2-31x-180
we want factors of -180 that add up to -31
-18 and 10 sum -8
-36 and 5 -31
ok
(x-36)*(x+5)=0
x=36 and x=-5
reject negative
x=36
20/36+20/45=1
5/9+4/9=1
jack take 45 hours alone and mike takes 36 alone
and together they take 20 hours
in 20 hours jack does 4/9 of the job and mike does 5/9
RELATED QUESTIONS
Huck Finn takes five hours longer to paint a fence than it does Tom Sawyer. Together,... (answered by DrBeeee)
It takes Dave 20 hours to paint a fence. When he works with Mike, they can paint the same (answered by Alan3354,jim_thompson5910)
Bob and Sarah need to paint a fence. Bob can paint a fence in 4 hours and Sarah can paint (answered by josgarithmetic,addingup,greenestamps)
it takes Mark five hours to paint a fence. Abharsa can paint the same fence in nine... (answered by macston)
It takes Tom 3 hours less to paint a fence than Jim. If the two boys work together, they... (answered by marcsam823)
It takes Robert 9 hours longer to construct a fence than it takes Eldin. If they work... (answered by math_tutor2020,MathTherapy)
Tina can paint a fence in 8 hours. Tom can paint the same fence in 4 hours. How long will (answered by sachi,Cromlix)
It takes Sara 2 hours to paint a fence and Daniel 4 hours to paint the same fence. How... (answered by Edwin McCravy,stanbon,Alan3354)
When Sean and Allen work together, they can paint a fence in 9 hours. Working alone,Sean... (answered by josgarithmetic)