SOLUTION: Chuck can shovel the snow off his driveway in 40 minutes. He shovels for 20 minutes and then is joined by Joan. If they shovel the remaining snow in 10 minutes, how long would it
Algebra.Com
Question 29279: Chuck can shovel the snow off his driveway in 40 minutes. He shovels for 20 minutes and then is joined by Joan. If they shovel the remaining snow in 10 minutes, how long would it have taken Joan to shovel the driveway alone?
Answer by askmemath(368) (Show Source): You can put this solution on YOUR website!
I could solve it the longer way, but the shorter way is easier to understand
Chuck shovelled for a total of 30mins
In 30 mins he would have shovelled 30/40= 3/4th of the walk
Joan shovelled for 10mins
She shovelled the remaining 1/4th in 10mins
For her to shovel the entire thing
So Joan also would take 40mins to shovel the driveway
RELATED QUESTIONS
Chuck can shovel the snow off his driveway in 40 minutes. He shovels for 20 minutes and... (answered by bucky)
Pls. help me with this HW problem. I've tried using the formula, WR x WT = work done,... (answered by oscargut)
Dan can shovel dirt off his lawn in 40min. He shovels for 20 min and then is joined by... (answered by ankor@dixie-net.com)
Joan can shovel a certain driveway in 50 minutes. If Mary can shovel the same driveway... (answered by ewatrrr)
Mary can shovel snow from her driveway in 40 minutes. Bill can do the same job in 65... (answered by josmiceli,Alan3354)
sue can shovel snow from her driveway in 45 minutes. jum can do the same job in 40... (answered by jim_thompson5910)
Joan can shovel a certain driveway in 50 minutes. If mary can shovel the same driveway... (answered by nerdybill)
Gertrude and Bertha are sisters. They are responsible for keeping the family's driveway... (answered by josgarithmetic)
janet can shovel snow from her driveway in 30 minutes. Bill can do the same job in 40... (answered by stanbon)