SOLUTION: P can do a piece of work in 9 days. Q is 50% more efficient than P. The number of days it takes: Q to do the same piece of work is
a 13 1/2 b 4 1/2 c 6 d 3 e None of these.an
Algebra.Com
Question 268933: P can do a piece of work in 9 days. Q is 50% more efficient than P. The number of days it takes: Q to do the same piece of work is
a 13 1/2 b 4 1/2 c 6 d 3 e None of these.ans=a
Answer by waheed_alli(1) (Show Source): You can put this solution on YOUR website!
RELATED QUESTIONS
3. P can do a piece of work in 9 days. Q is 50% more efficient than P. The number of days (answered by MathLover1)
p&q can do a piece of work in 10 days, q&R in 12 days while p&R can do it in 12 days .in... (answered by ankor@dixie-net.com)
P can do a piece of work in 20 days and Q in 24 days. (answered by richwmiller)
P can do a piece of work in 20 days and Q in 24 days. find how much time will they take... (answered by richwmiller)
P can do a piece of work in 20 days and Q in 24 days. find how much time will they take... (answered by richwmiller)
P can do a piece of work in 20 days (answered by richwmiller)
A can do a piece of work in 30 days,and B can do the same work in 40 days,if both do... (answered by richwmiller)
mogaka and onduso working together can do a piece of work in 6 days. mongaka, working... (answered by ikleyn,MathTherapy)
Eric and Nathan together can do a piece of work in 3 days. If it takes Eric working alone (answered by josgarithmetic)