SOLUTION: .A and B can do a piece of work in 12 days,B and C can do it in 15 days and C and A can do the same work in 20 days. How long would each take to complete the job?

Algebra.Com
Question 268391: .A and B can do a piece of work in 12 days,B and C can do it in 15 days and C and A can do
the same work in 20 days. How long would each take to complete the job?

Answer by ankor@dixie-net.com(22740)   (Show Source): You can put this solution on YOUR website!
Let the piece of work = 1
:
Write a shared work equation for each phrase:
:
A and B can do a piece of work in 12 days,
+ = 1
:
B and C can do it in 15 days and
+ = 1
;
C and A can do the same work in 20 days.
+ = 1
:
Use elimination; Mult the 1st eq by 5, mult the 3nd eq by 3
+ = 5
+ = 3
------------------------------Subtraction eliminates A, leaving us with
- = 2
:
Multiply the 2nd equation by 4, add to the above equation
- = 2
+ = 4
-------------------------------addition eliminates C, find B
= 6
120 = 6B
B =
B = 20 hrs working alone
:
Use the 2nd equation to find C, substitute 20 for B, find C
+ = 1
Multiply by 20C, results:
15C + 20(15) = 20C
15C + 300 = 20C
300 = 20C - 15C
5C = 300
C =
C = 60 hrs working alone
:
Use the 3rd equation to find A
+ = 1
Multiply by 60A
60(20) + 20A = 60A
1200 = 60A - 20A
40A = 1200
A =
A = 30 hrs working alone
:
Summarize: A=30; B=20; C=60
;
:
Check it in the 1st equation
+ = 1
+ =
+ = 1
:
YOu can confirm it in the other two equations.

RELATED QUESTIONS

A, B, and C can do a piece of work in 10 days. A and B can do it in 12 days, A and C in... (answered by josmiceli)
A,B, and C can do a piece of work in 10 days. A and B can do it in 12 days, A and C in 20 (answered by dkppathak)
A and B can do a piece of work in 12 days , B and C can do it in 15 days and C and A can... (answered by richwmiller)
A,B and C do a piece of work in 10 days. A and B can do it in 12 days. A and C in 20... (answered by savvyhush23)
A,B and C can do a piece of work together in 15 days. B alone can do in 30 days and C... (answered by ankor@dixie-net.com)
A and B can do a piece of work in 42 days, B and C in 31 days and C and A in 20 days. In... (answered by Edwin McCravy,AnlytcPhil,Edwin Parker)
A and B can do a piece of work in 12 days, B and C can do it in 15 days and C and A can... (answered by solver91311)
A and B can do a piece of work in 42 days, B and C in 31 days, and A and C in 20 days.... (answered by ptaylor,Edwin Parker)
a and b can do a piece of work in 18 days, b and c can do it in 24 days while c and a... (answered by ikleyn)