Question 252648: If Mario can do a piece of work in 3 days and Joey in 2 days, in how many days can they do the same work together?
Answer by Alan3354(69443) (Show Source): You can put this solution on YOUR website!
If Mario can do a piece of work in 3 days and Joey in 2 days, in how many days can they do the same work together?
--------------------------------
Realistically, about 7 days, since they'll waste time together.
Using math, tho:
M does 1/3 of the work per day.
J does 1/2 of the work per day.
Together, 1/3 + 1/2 = 5/6 of the work per day.
--> 6/5 days to do the work, or 1.2 days.
-----------------------------
Use the shortcut, product/sum
3*2/(3+2) = 6/5
RELATED QUESTIONS
A can do 1/3 of certain work in 10 days and B can do 2/5 of the same work in 8 days find... (answered by robertb)
Ramesh , Suresh and Harish can do a piece of work in 15 days, 10 days and 6 days... (answered by mananth)
A can do a piece of work in 2/3 as many days as B, and B can do the same work in 4/5 as... (answered by Edwin McCravy)
A can do a piece of work in 30 days,and B can do the same work in 40 days,if both do... (answered by richwmiller)
Pedro can do a piece work in 4 days,while Alan can do a piece of work in 5 days. In how... (answered by Edwin McCravy)
Artesia can do a piece of work in 10 days. After she has worked in two days, Fate came to (answered by josgarithmetic)
A can do a piece of work in 2 days as B can do in 3 days. B can do as much work in 4 days (answered by ankor@dixie-net.com)
Jack and Jill together can do a piece of work in 3 days.
They can finish the work if... (answered by Edwin McCravy,ikleyn)
Tom takes 3 days to do a piece of work while jerry takes only one day for the same.... (answered by ikleyn)