SOLUTION: It takes a man one hour to dig a hole 2 meters long, 2 meters wide, and 2 meters deep. How many hours would it take the same man to dig a hole 4 meters long, 4 meters wide, and 4 m

Algebra.Com
Question 252169: It takes a man one hour to dig a hole 2 meters long, 2 meters wide, and 2 meters deep. How many hours would it take the same man to dig a hole 4 meters long, 4 meters wide, and 4 meters deep, assuming that he digs at the same rate of speed?
A. 2 B. 4 C. 6 D. 8 E. 16

Answer by ptaylor(2198)   (Show Source): You can put this solution on YOUR website!
Let x=number of hours required to dig the big hole
The man moves dirt at the rate of 2^3 or 8 cu meters per hour
A hole 4X4X4=4^3=64 cu meters
So, our equation to solve is:
8x=64 cu meters
x=8 hours-------------------answer
Hope this helps---ptaylor

RELATED QUESTIONS

If it takes two men three hours to dig a hole 4 meter long, four meters wide, and four... (answered by god2012)
is it takes a man 1 hour to do a whole 3 meters long 3 meters wide and 3 meters deep how... (answered by josmiceli)
how long would it take four machines to dig a hole 40 meters long, 20 meters wide, and 10 (answered by mananth)
If it takes 8 men 9 hours to dig a hole in 20 meters deep,how long would it take 10 men... (answered by ankor@dixie-net.com)
If it takes 2 men 2 hours to dig a hole 3 foot long, 3 foot wide, 3 foot deep. How long,... (answered by solver91311)
How much dirt is there in a hole 5 meters long, 4 meters wide, and 2 meters deep? (answered by dragonwalker)
If it takes two men two hours to dig a hole 3 metres long, 3 metres wide and 3 metres... (answered by josgarithmetic)
if it takes a man 24 hours to dig a hole, how long would it take him to dig half a... (answered by jim_thompson5910)
Answer this school maths question - If it takes three men three hours to dig a hole, how... (answered by ankor@dixie-net.com)