Question 242964: It takes 18 men 6 hours to dig a trench 720 feet long. Working at the same rate, how many feet of trench can be dug by 24 men in 8 hours?
Answer by ankor@dixie-net.com(22740) (Show Source): You can put this solution on YOUR website!
It takes 18 men 6 hours to dig a trench 720 feet long.
Working at the same rate, how many feet of trench can be dug by 24 men in 8 hours?
:
We can use man-hrs here.
:
18*6 = 108 man-hrs for 720 ft
that's
= 6 ft per man-hr
:
24 * 8 * 6 = 1280 ft
RELATED QUESTIONS
6 men can dig a trench in 3 days. How many days will it take 9 men to dig the same trench (answered by Edwin McCravy)
it takes 8 men 9 hours to dig a trench.how long would it take 6 men to dig the trench if... (answered by ankor@dixie-net.com)
If it took 8 labourers 28 days to dig a trench,how long will it take 6 labourers working... (answered by stanbon,Edwin McCravy)
Two men dig a trench 30 m long in 3 days. How long would it take 3 men to dig a trench 15 (answered by ikleyn)
Ten men can dig a trench in 4 days.How many men would dig the same trench in 2... (answered by Alan3354,ankor@dixie-net.com)
if 12 men can dig a trench in 8 days, how many men can dig it in 6 days at the same rate?
(answered by josmiceli,ptaylor)
In 8 days a trench was dug by 12 men. How many days will the same trench be dug by 4... (answered by richwmiller)
If it takes twelve men 8 days to dig a trench how many men does it take in 6... (answered by josgarithmetic)
If 12 men can dig a trench in 8 days how many men can dig it in 6... (answered by josgarithmetic,greenestamps)