SOLUTION: A can do a job in 12hrs. B can do the same job in 16hrs. A does a part of work and leaves the rest for B. If A works for 9hrs, how many hours will it take B to finish the remaining
Algebra.Com
Question 239761: A can do a job in 12hrs. B can do the same job in 16hrs. A does a part of work and leaves the rest for B. If A works for 9hrs, how many hours will it take B to finish the remaining job?
Answer by Theo(13342) (Show Source): You can put this solution on YOUR website!
A = rate of A = 1/12 of the job in 1 hour.
B = rate of B = 1/16 of the job in 1 hour.
A * (1/12) * 12 = 1 means A takes 12 hours to complete 1 job.
B * (1/16) * 16 = 1 means B takes 16 hous to complete 1 job.
A * 9 = (1/12)*9 = 9/12 means A completes 9/12 of the job in 9 hours.
1 - 9/12 = 3/12 means 3/12 of the job remains to be done.
B * x = 3/12 means B will complete 3/12 of the job in x hours.
x = (3/12) / B means divide both sides of the equation by B to solve for x.
x = (3/12) / (1/16) means dividing by B is the same as dividing by (1/16)
x = (3/12) * (16) means dividing by (1/16) is the same as multiplying by 16.
x = (3 * 16) / 12 means (3*16)/12 is equivalent to (3*16)/12.
x = 16 / 4 means simplify the expression.
x = 4 means solve for x to get the answer.
It will take B 4 more hours to complete the job.
That's a total of 9 + 4 = 13 hours.
9 * (1/12) + 4 * (1/16) = (9/12) + (1/4) = (3/4) + (1/4) = 1 means confirm the answer is good by carrying out the complete calculation with the solved value for x.
9/12J =
RELATED QUESTIONS
mr a can do a job for 3 days while mr b can do the same job for 6 days. if the two of... (answered by stanbon)
Workers A and B can complete a particular job if they work together for 12 days. If A... (answered by richwmiller)
Workers A and B can complete a particular job if they work together for 12 days. If A... (answered by stanbon)
a and b can each do a piece of work in 15 days and 18 days. if a works for 10 days, how... (answered by stanbon)
Workers A and B, working together, can finish a job in 8 hours. If they work together for (answered by ptaylor)
Alan can do a piece of work in 15 days; Bill can do it in 20 days. If Alan works alone on (answered by josmiceli)
A,B,C can complete a work in 2 hours . if A does the job alone in 6 hours and B in 5... (answered by richwmiller)
A librarian arranges books in 3 hours. A volunteer student can do the same job in 5... (answered by KMST)
A and B working together can finish the job alone in 3 hours , while A can finish the job (answered by jorel1380,MathTherapy)