SOLUTION: An engineer takes 1 hour longer to do a job than the other engineer. Working together they can finalize a job in 5 hours. How long would it take for each of them to do the job alon

Algebra.Com
Question 22479: An engineer takes 1 hour longer to do a job than the other engineer. Working together they can finalize a job in 5 hours. How long would it take for each of them to do the job alone?
Answer by stanbon(64) (Show Source):
Assume the 1st engineer can do the job in "x" hours.
Then each hour he is doing 1/x of the job.
The 2nd engineer does the job in "x+1" hours.
So each hour he is doing 1/(x+1) of the job.
Equation:
They work together for 5 hours and get the job done so
5[(1/x) +(1/(x+1)] = 1 job
Solve for x and x+1.
I understand so far but I cannot get past this .....
x^2-9x+5, I cannot factor it down so I can get the answer.

Answer by stanbon(75887)   (Show Source): You can put this solution on YOUR website!
I think it is x^2-9x-5=0
Solved by pluggable solver: SOLVE quadratic equation (work shown, graph etc)
Quadratic equation (in our case ) has the following solutons:



For these solutions to exist, the discriminant should not be a negative number.

First, we need to compute the discriminant : .

Discriminant d=101 is greater than zero. That means that there are two solutions: .




Quadratic expression can be factored:

Again, the answer is: 9.52493781056044, -0.524937810560445. Here's your graph:


Cheers,
Stan H.

RELATED QUESTIONS

An engineer takes 1 hour longer to do a job than the other engineer. Working together... (answered by Paul,stanbon)
Can you please help me with this? A software development company is getting ready to... (answered by mukhopadhyay)
A and B working together can complete a job in 7 1/2 hours. Working alone, A takes 8... (answered by ankor@dixie-net.com)
Alex and Boy working together can complete a job in 7 1\2 hours. Working alone, Alex... (answered by edjones)
Pete can do a job in 4 hours less than Sam can. Working together,they can complete the... (answered by josmiceli)
It takes Bob four hours longer to repair a car than it takes Ken. Working together, they... (answered by richwmiller,phal79)
It takes Joe x hours to do a job. What part of the job can he do in 1 hour? Jane takes (answered by ankor@dixie-net.com)
A new automatic machine can do a job in 1 hour less than an older machine. Together they... (answered by TimothyLamb)
Working together two people can cut a large lawn in 3 hours one person can do the job... (answered by stanbon)