SOLUTION: It takes one man one day to dig a 2m x 2m x 2m hole. How many days will it take 3 men working at the same rate to dig a 4m x 4m x 4m hole? (A)3/8 (B)2/3 (C)4/3 (D)3/2 (E)8/3

Algebra.Com
Question 207039: It takes one man one day to dig a 2m x 2m x 2m hole. How many days will it take 3 men working at the same rate to dig a 4m x 4m x 4m hole?
(A)3/8 (B)2/3 (C)4/3 (D)3/2 (E)8/3

Answer by ankor@dixie-net.com(22740)   (Show Source): You can put this solution on YOUR website!
It takes one man one day to dig a 2m x 2m x 2m hole.
How many days will it take 3 men working at the same rate to dig a 4m x 4m x 4m hole?
:
From the 1st statement we can say:
1 man/day to dig a hole 2^3 = 8 cu meter hole
:
Let d = no. of days for 3 men to dig a 4^3 = 64 cu meter hole
3d =
3d = 8
d = days for 3 men to dig 4^3 cu/m hole

RELATED QUESTIONS

It takes one man one day to dig to day a 2m*2m*2m hole.How long does it takes 3 men... (answered by vleith)
10 men take 7 days to dig a hole. how many days will it take 4 men to dig the same hole... (answered by stanbon)
If 6 men can dig a hole in 10 days how many days will it take 12 men to dig the same hole (answered by ikleyn)
if 4 men work for 6 hours a day for 3 days to dig a hole. how long will it take 12 men to (answered by macston)
6 men can dig a trench in 3 days. How many days will it take 9 men to dig the same trench (answered by Edwin McCravy)
It takes a man one hour to dig a hole 2 meters long, 2 meters wide, and 2 meters deep.... (answered by ptaylor)
Answer this school maths question - If it takes three men three hours to dig a hole, how... (answered by ankor@dixie-net.com)
If it takes 6 men 4 days to dig a hole 3 metres deep, how long will it take for 10 men to (answered by josgarithmetic,ikleyn)
If it takes Jeremy 18 hours to dig a 2 meter by 2 meter by 2 meter hole, how many hours... (answered by stanbon)