SOLUTION: mar can paint a wall in 5 days while leave can finish the some work in 3 days.In how many days can they do the same work?
Algebra.Com
Question 131085: mar can paint a wall in 5 days while leave can finish the some work in 3 days.In how many days can they do the same work?
Answer by ptaylor(2198) (Show Source): You can put this solution on YOUR website!
Let x=number of days it takes them working together to paint 1 wall.
mar paints at the rate of 1/5 wall per day
leave paints at the rate of 1/3 wall per day
together they paint at the rate of 1/5+1/3 or 3/15+5/15=8/15 wall per day, so our equation to solve is:
(8/15)*x=1 (1 wall, that is) multiply each side by 15
8x=15 divide both sides by 8
x=1 7/8 days --------------------------------number of days it takes them working together to paint 1 wall
Hope this helps---ptaylor
RELATED QUESTIONS
Mar can paint a wall in 5 days while Louie can finish the same work in 3 days. In how... (answered by vleith)
Tom takes 3 days to do a piece of work while jerry takes only one day for the same.... (answered by ikleyn)
Pedro can do a piece work in 4 days,while Alan can do a piece of work in 5 days. In how... (answered by Edwin McCravy)
If Mario can do a piece of work in 3 days and Joey in 2 days, in how many days can they... (answered by Alan3354)
Tyrin can paint a house in 4 days. Tahjai can paint the same house in 5 days. How many... (answered by bonster)
10men can paint a room in 6 days how many days can 5men do the same piece of work (answered by stanbon)
A can do a piece of work in 2 days as B can do in 3 days. B can do as much work in 4 days (answered by ankor@dixie-net.com)
tom takes 3days to do a piece of work while jerry takes only one day for the same.... (answered by josgarithmetic)
tom takes 3days to do a piece of work while
jerry takes only one day for the same.... (answered by josgarithmetic,ikleyn)