SOLUTION: Working alone, A can complete a task in ‘a’ days and B in ‘b’ days. They take turns in doing the task with each working 2 days at a time. If A starts they finish the task i

Algebra.Com
Question 1208469: Working alone, A can complete a task in ‘a’ days and B in ‘b’ days. They take turns in doing the task with each working 2 days at a time. If A starts they finish the task in exactly 10 days. If B starts, they take half a day more. How long does it take to complete the task if they both work together?

Answer by ikleyn(52765)   (Show Source): You can put this solution on YOUR website!
.
Working alone, A can complete a task in ‘a’ days and B in ‘b’ days.
They take turns in doing the task with each working 2 days at a time.
If A starts they finish the task in exactly 10 days.
If B starts, they take half a day more.
How long does it take to complete the task if they both work together?
~~~~~~~~~~~~~~~~~~~~~~

So, their rates of work are  1/a for A and 1/b for B.


In the first scenario, A works 6 days; B works 4 days.  So, first equation is

     +  = 1  (the entire job)         (1)


In the second scenario, A works 4.5 days; B works 6 days. So, second equation is 

     +  = 1  (the entire job)    (2)


To solve, multiply equation (1) by 3; multiply equation (2) by 2 and subtract the second from the first.


You will get then

     -  = 3 - 2,  or

     = 1.


Hence,  a = 9, which means that A makes the entire job in 9 days working alone.

Then from (1)

     = 1 -  = 1 -  = .


Hence, b = 12, which means that B makes the entire job in 12 days working alone.


Working together, they will complete the job in  

     =  = 5 days = 5 days.    ANSWER

Solved.



RELATED QUESTIONS

Set up a system of three equations with three variables. A, B, and C complete a task in... (answered by richwmiller)
A, B, and C complete a task in 3 days. On the first day they do 1/3 of the task with A... (answered by richwmiller)
solving this question regarding completion of a task: Person A says he can complete a... (answered by ankor@dixie-net.com)
Arun completes a task in 8hrs . He arun and bala work together they can complete same... (answered by richwmiller)
If two boys working together can complete a task in 2.5 hours and A working alone can... (answered by josgarithmetic)
It takes person A 4 hours less than person B to complete a certain task. Working... (answered by josmiceli)
Machine A can complete a task in 24 seconds. Together with machine B, the task can be... (answered by nerdybill)
It takes copy machine A one hour less to complete a copying task when working alone than... (answered by richwmiller)
P can complete a task in x days while Q takes (x + 12) days to do the same task. a) What (answered by Edwin McCravy,Theo)