SOLUTION: It takes 20 men 60 days to complete a building work.how many days longer would it take 15 men, assuming that they all work at the same rate (formula method)

Algebra.Com
Question 1203763: It takes 20 men 60 days to complete a building work.how many days longer would it take 15 men, assuming that they all work at the same rate (formula method)


Found 4 solutions by mananth, josgarithmetic, greenestamps, mccravyedwin:
Answer by mananth(16946)   (Show Source): You can put this solution on YOUR website!
It takes 20 men 60 days to complete a building work.
how many days longer would it take 15 men, assuming that they all work at the same rate (formula method)
In this problem itis a case of inverse proportion.
W1 *M1=W2*M2
20*60 = 15*x
(20/15) *60 =x
= 80 days
So 15 men will take 20 days more to complete the job

Answer by josgarithmetic(39617)   (Show Source): You can put this solution on YOUR website!
---------------------------------------------
20 men 60 days to complete a building work.
---------------------------------------------

, assuming 1 full piece of work


-----------------------------------------------
how many days longer would it take 15 men,
-----------------------------------------------
(Also notice how 15 relates to 20.)



Ratio of the the two equations will eliminate r.



-------------------twenty more days

Answer by greenestamps(13200)   (Show Source): You can put this solution on YOUR website!


I don't know exactly what method you are calling the "formula method".... But simple logical reasoning can find the answer with far less work than with any formal algebra.

15 men working instead of 20 is 15/20 = 3/4 as many men, so to complete the job requires 4/3 as many day.

4/3 of 60 days is 80 days, which is 20 days more than 60.

ANSWER: 20 more days


Answer by mccravyedwin(407)   (Show Source): You can put this solution on YOUR website!
It takes 20 men 60 days to complete a building work. how many days longer would
it take 15 men, assuming that they all work at the same rate (formula method)
You want the formula method but first, this is the best way:
Get the least common multiple of two of the corresponding given quantities.
Think of what would happen if you had that least common multiple instead.
Then think of what would happen if you had the other quantity. 

The least common multiple of 20 men and 15 men is 60 men.
Since it takes 20 men 60 days to complete a building work,
three times as many men, 60, will take 1/3 as long, or 20 days.
Then, one fourth as many men as that, 15, will take 4 times as long or 80 days.
Then 80 days is 20 more days than 60. 

But your prof doesn't like reasoning it out, and wants you to plug in a formula.
OK, let's humor your prof.

Use the worker-time-job formula, which is:



where

W1 = the number of workers in the first situation.
T1 = the number of time units (days in this case) in the first situation.
J1 = the number of jobs done in the first situation.

W2 = the number of workers in the second situation.
T2 = the number of time units (days in this case) in the second situation.
J2 = the number of jobs done in the second situation.

W1 = 20             W2 = 15     
T1 = 60             T2 = unknown quantity 
J1 =  1             J2 =  1











80 days is 20 more days than 60.  Answer: 20 days.

Edwin

RELATED QUESTIONS

IT TAKES 20 MEN 60DAYS TO COMPLETE A BUILDING WORK, HOW MANY DAYS LONGER WOULD IT TAKES... (answered by josgarithmetic,Alan3354,greenestamps,MathTherapy)
It takes 20 men to build a building for 60 days.Assuming that all men work at this rate,... (answered by ewatrrr)
If it takes 64 men 15 days to complete a job, how many more men would be required to... (answered by Alan3354,richwmiller)
It takes 20 men 8 days to complete 1/4 of the work. How many men are needed to complete... (answered by richwmiller)
If it takes 8 men to complete a job in 8 days, how many days would it take 1... (answered by stanbon)
The erection of a tower takes 24 men to complete in 15 days. How many days will it take 9 (answered by ptaylor)
If it takes 6 men to complete a job in 12 days, how many men would it take to complete... (answered by richwmiller)
60 persons can complete a building in 250 days . after 200 days , work stopped for 10... (answered by ewatrrr)
if it takes 9 men 15 days to complete a construction job, how long would it take to... (answered by ankor@dixie-net.com)