SOLUTION: the time required to complete an engine overhaul varies inversely as the number of people who work on the job. it takes 4 hours for 6 students to complete an engine overhaul. if th
Algebra.Com
Question 1200701: the time required to complete an engine overhaul varies inversely as the number of people who work on the job. it takes 4 hours for 6 students to complete an engine overhaul. if they all work at the same rate, how long would it take 2 students to complete the job?
Found 2 solutions by Theo, ikleyn:
Answer by Theo(13342) (Show Source): You can put this solution on YOUR website!
y = k/x is the inverswe proportion formula.
k is the constant of variation.
y = number of hours to finish the job.
x = the number of people required.
when 6 people are working, the job is finished in 4 hours.
formula becomes 4 = k/6
solve for k to get k = 24
when 2 people are working, the formula becomes y = 24/2.
solve for y to get y = 12
6 people can do the job in 4 hours.
2 people can do the job in 12 hours.
you can also use the people * rate * time = quantity formula.
when 6 people can do the job in 4 hours, you get:
6 * r * 4 = 1
6 is the number of people.
r is the rate that each person works at
4 is the number of hours.
1 is the quantity of work performed (1 job)
solve for r to get r = 1/24 of the job per person
when the number of people is 2 and the rate per person remains the same, the formula bgecomes 2 * 1/24 * t = 1
solve for t to get t = 1 * 24 / 2 = 12
your solution is 2 people can finish the job in 12 hours.
Answer by ikleyn(52750) (Show Source): You can put this solution on YOUR website!
.
The time required to complete an engine overhaul varies inversely as the number of people who work on the job.
it takes 4 hours for 6 students to complete an engine overhaul.
If students work at the same rate, how long would it take 2 students to complete the job?
~~~~~~~~~~~~~~~~~~~
The original formulation was ABSOLUTELY INCORRECT (at the level to call for urgent medical assistance)
so I edited it to make sense - - - from nonsense.
The answer lies at the surface.
For 2 students, it will take three times as much time as it takes for 6 students.
When people come with such primitive questions, I get trouble: what are they taught in school ?
And how their minds work ?
And who really teaches them in such terrifying way ?
RELATED QUESTIONS
the time t required to do a certain job varies inversely as the number of people in... (answered by ankor@dixie-net.com)
The time, t, required to complete a project varies inversely with the number of people,... (answered by solver91311)
The time required to complete a job varies inversely as the number of people working. It... (answered by fractalier)
Please include the following in your work on each word problem:
a) A statement... (answered by rothauserc)
I am working with Rational Expressions and Equations:
The time required to do a job... (answered by josmiceli)
Inverse variation, Solve following problem
1. The time t required to do a job varies... (answered by math_helper,Theo)
Classify the following as discrete or continuous random variables.
(A) The number of... (answered by stanbon)
The number of workers is required to complete a job varies inversely as the time spent... (answered by josgarithmetic)
The time T to do a job varies inversely as the number of
people P working. It takes... (answered by richwmiller)