With two reapers operating, a field can be harvested in 1 h.
If only the newer reaper is used, the crop can be harvested in 1.5 h.
How long would it take to harvest the field using only the older reaper?
~~~~~~~~~~~~~~~
The combined rate of work of two reapers is = 1 job per hour.
The individual rate of work of the new reaper is
1_field/1.5_hours = = = of the job per hour.
Hence, the rate of work of the old reaper is 1 - 2/3 = 1/3 of the job per jour.
It means that the field can be harvested in 3 hours, if only old reaper is used.
ANSWER. 3 hours.
Solved.