Question 1191584: IT TAKES 20 MEN 60DAYS TO COMPLETE A BUILDING WORK, HOW MANY DAYS LONGER WOULD IT TAKES 15 MEN ASSURING THAT THEY ALL WORK AT THE SAME RATE
Found 4 solutions by josgarithmetic, Alan3354, greenestamps, MathTherapy:
Answer by josgarithmetic(39630)   (Show Source): You can put this solution on YOUR website!
20 men need 60 days for the job
15 men, then the speed becomes 0.75 of what it was so .

To use some algebra,
r, the work rate of 1 man
1, for 1 piece of work or job
x, how many days






Answer by Alan3354(69443)   (Show Source): You can put this solution on YOUR website!
IT TAKES 20 MEN 60DAYS TO COMPLETE A BUILDING WORK, HOW MANY DAYS LONGER WOULD IT TAKES 15 MEN ASSURING THAT THEY ALL WORK AT THE SAME RATE
----------------
Jobs are often expressed in man-hours of man-days estimated to do them.
20*60 = 1200 man-days
1200/15 = 80 days

Answer by greenestamps(13209)   (Show Source): You can put this solution on YOUR website!


15/20 = 3/4 as many men means 4/3 as many days.

ANSWER: 60(4/3) = 80 days


Answer by MathTherapy(10557)   (Show Source): You can put this solution on YOUR website!

IT TAKES 20 MEN 60DAYS TO COMPLETE A BUILDING WORK, HOW MANY DAYS LONGER WOULD IT TAKES 15 MEN ASSURING THAT THEY ALL WORK AT THE SAME RATE
                                    
Time it takes 15 men, working at the same rate, or
Days longer that it'd take 15 men: 80 - 60 = 20
RELATED QUESTIONS

It takes 20 men 60 days to complete a building work.how many days longer would it take 15 (answered by mananth,josgarithmetic,greenestamps,mccravyedwin)
It takes 20 men to build a building for 60 days.Assuming that all men work at this rate,... (answered by ewatrrr)
If 8 men can paint a school in 15 days, how many days would it take for 12 men to paint... (answered by jorel555)
If it takes 64 men 15 days to complete a job, how many more men would be required to... (answered by Alan3354,richwmiller)
It takes 20 men 8 days to complete 1/4 of the work. How many men are needed to complete... (answered by richwmiller)
The erection of a tower takes 24 men to complete in 15 days. How many days will it take 9 (answered by ptaylor)
If it takes 6 men to complete a job in 12 days, how many men would it take to complete... (answered by richwmiller)
If it takes 8 men to complete a job in 8 days, how many days would it take 1... (answered by stanbon)
if it takes 9 men 15 days to complete a construction job, how long would it take to... (answered by ankor@dixie-net.com)