SOLUTION: 7 men can dig a drain in 10 days. how many men would dig the same drain in 14 days

Algebra.Com
Question 1185315: 7 men can dig a drain in 10 days. how many men would dig the same drain in 14 days

Found 3 solutions by josgarithmetic, ikleyn, greenestamps:
Answer by josgarithmetic(39617)   (Show Source): You can put this solution on YOUR website!
Same job of 1 drain to dig?
7 men for 10 days;
n men for 14 days;




Answer by ikleyn(52784)   (Show Source): You can put this solution on YOUR website!
.
7 men can dig a drain in 10 days. how many men would dig the same drain in 14 days
~~~~~~~~~~~~~~~~~~~~~~~

The whole job is 7*10 = 70 man-days.


To complete the job in 14 days, 5 = 70/14  workers are needed.    ANSWER

Solved, answered and explained.



Answer by greenestamps(13200)   (Show Source): You can put this solution on YOUR website!


You have two responses showing different ways to solve the problem.

Here is a third method.

They are all good methods. Try each one and find the one that "works" for you and use it on future similar problems.

Better yet, understand all three methods; depending on how a particular problem is presented, any one of the three methods might be easier to use.

The third method for this problem...

The number of days is increased by a factor of 14/10 = 7/5. 7/5 as many days means 5/7 as many men will be needed.

ANSWER: 7*(5/7) = 5 men will be needed


RELATED QUESTIONS

If 5 men dig a drain in 14 days, how long would 7 men take working at the same rate?... (answered by richwmiller)
If 6 men can dig a hole in 10 days how many days will it take 12 men to dig the same hole (answered by ikleyn)
If 3 men dig ridges in 21 days. How many men will dig the same ridges in 7... (answered by josgarithmetic)
4 men or 6 boys can dig a well in 14 days . how long would 2 men and 4 boys take to dig... (answered by ankor@dixie-net.com)
if 12 men can dig a trench in 8 days, how many men can dig it in 6 days at the same rate? (answered by josmiceli,ptaylor)
6 men can dig a trench in 3 days. How many days will it take 9 men to dig the same trench (answered by Edwin McCravy)
Ten men can dig a trench in 4 days.How many men would dig the same trench in 2... (answered by Alan3354,ankor@dixie-net.com)
If 12 men can dig a trench in 8 days how many men can dig it in 6... (answered by josgarithmetic,greenestamps)
10 men take 7 days to dig a hole. how many days will it take 4 men to dig the same hole... (answered by stanbon)