SOLUTION: if it takes 6 days for 6 workers to build a garage, how long would it take 9 workers?

Algebra.Com
Question 1150533: if it takes 6 days for 6 workers to build a garage, how long would it take 9 workers?
Found 3 solutions by Edwin McCravy, ikleyn, greenestamps:
Answer by Edwin McCravy(20054)   (Show Source): You can put this solution on YOUR website!
if it takes 6 days for 6 workers to build a garage, how long would it take 9 workers?
We have 6 workers the first time and 9 workers the second time.

The least common multiple of 6 workers and 9 workers is 18 workers.

if it takes 6 days for 6 workers to build a garage, then what about 18 workers?
They would work 3 times as fast so it would take them only 1/3 as long as it
took 6 workers, or only 2 hours.

So if it takes 18 workers 2 hours to build a garage, then 9 workers would take
twice as long, so it would take them 4 hours.

Edwin


Answer by ikleyn(52776)   (Show Source): You can put this solution on YOUR website!
.

The entire job is  6*6 = 36  worker-days  (man-days,  as it was called long time ago . . . ).


Therefore,  9 workers will complete this job in    = 4 days.         ANSWER


ANSWER.   9 workers will complete this job in  4  days.


------------

I remember,  we solved such problems when I was at my  4-th  or  5-th grade class.

All the students loved this type of problems,  because  EVERYBODY  knew how to solve them.

So,  ignore explanations from  Edwin  (with his Least Common Multiplies - they are  IRRELEVANT),


                and use the mantra from my post . . .


/\/\/\/\/\/\/\

After reading the post by @greenestamps.

    Yes, you can use the method these two gentlemen propose you.


    But it is the same, as to fly from Chicago  to Indianapolis with intermediate landing in Denver.


    The way I propose in my post is the standard direct straightforward shortest Algebra way for this type of problems.


Answer by greenestamps(13198)   (Show Source): You can put this solution on YOUR website!


You would do well to ignore the proclamation by tutor @ikleyn about her mantra.

Find your own mantra.

The solution method shown by tutor @edwin is perfectly valid. You might find it is more to your liking than hers.

In my opinion, her use of man-days is "irrelevant"....

9 workers is 3/2 times as many as 6 workers; the amount of time required is going to be 2/3 as much. 2/3 of 6 days is 4 days.

Again, ignore anybody who tells you a particular method of solving a problem is wrong.

Keep your mind open and find a solution method that YOU like.


RELATED QUESTIONS

It takes 12 workers 30 days to build a house. How long would it take 18 similar workers? (answered by ramkikk66)
if 6 workers can build 4 cars in two days then how many days would it take 8 workers to... (answered by oberobic,ankor@dixie-net.com)
in a chocolate factory it took 20 workers 6 days to fil an order for chocolate valentine... (answered by ankor@dixie-net.com)
if it takes 200 workers to build 2 miles of road in 3 weeks how maney workers would it... (answered by oberobic,ankor@dixie-net.com)
How long will it take 4 workers to complete a task, given that it takes 6 days for 6... (answered by Simnepi)
It takes 4 workers 9 days to lay a stretch of road. How long does it take 6 workers to... (answered by josmiceli)
if 8 workers take 6 hours to build a deck, how long will it take for 2 workers to do the... (answered by stanbon,MathTherapy)
It take 8 workers 7 days to build one house. 8:7:1 How long does it take 6 workers to (answered by josgarithmetic)
If it takes 6 workers one hour to put together one car, how long would it take 9 workers... (answered by stanbon)